Ramsey - Prairie 230KV Line Tap (J889)

Ramsey - Prairie 230KV Line Tap is a 150.0 MW wind interconnection project in Nelson County, North Dakota with a current status of withdrawn. It is proposed to connect at Ramsey - Prairie 230KV Line Tap.

150.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameRamsey - Prairie 230KV Line Tap
Queue IDJ889
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity150.0 MW
StateNorth Dakota
CountyNelson County
Point of interconnectionRamsey - Prairie 230KV Line Tap
Requested (queue) date2017-06-16
Proposed in-service date2020-09-15
Operational date2020-09-15
Withdrawn date2019-10-24
Developer
Utility / transmission ownerGREAT RIVER ENERGY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.