RANCHO FRESNO STORAGE FARM (1245)

RANCHO FRESNO STORAGE FARM is a 30.6 MW battery interconnection project in Fresno, California with a current status of withdrawn. It is proposed to connect at PG&E Kearney Sub 70 kV.

30.6 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameRANCHO FRESNO STORAGE FARM
Queue ID1245
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyBattery
Capacity30.6 MW
StateCalifornia
CountyFresno
Point of interconnectionPG&E Kearney Sub 70 kV
Requested (queue) date2016-05-02
Proposed in-service date
Operational date
Withdrawn date2017-05-12
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.