RANEGRAS EAGLETAIL is a 900.0 MW gas interconnection project in La Paz/maricopa, Arizona with a current status of withdrawn. It is proposed to connect at Devers-Palo Verde 500 kV Line.

900.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameRANEGRAS EAGLETAIL
Queue ID388
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyGas
Capacity900.0 MW
StateArizona
CountyLa Paz/maricopa
Point of interconnectionDevers-Palo Verde 500 kV Line
Requested (queue) date2008-05-29
Proposed in-service date
Operational date
Withdrawn date2011-03-22
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.