Raritan River 115 kV (AF2-413)

Raritan River 115 kV is a 250.0 MW battery interconnection project in Atlantic, New Jersey with a current status of active.

250.0 MWCapacity
ActiveStatus
Market
BatteryTechnology

Project facts

Canonical nameRaritan River 115 kV
Queue IDAF2-413
Statusactive
Source statusEngineering and Procurement
Market
TechnologyBattery
Capacity250.0 MW
StateNew Jersey
CountyAtlantic
Point of interconnection
Requested (queue) date2020-03-31
Proposed in-service date2031-01-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerJCPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-16proposed_online_date2030-01-312031-01-31medium
2026-07-29new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata