Raritan River 230 kV (AD1-113)

Raritan River 230 kV is a 35.0 MW gas interconnection project in Middlesex, New Jersey with a current status of withdrawn.

35.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameRaritan River 230 kV
Queue IDAD1-113
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity35.0 MW
StateNew Jersey
CountyMiddlesex
Point of interconnection
Requested (queue) date2017-09-25
Proposed in-service date2021-06-01
Operational date
Withdrawn date2022-02-16
Developer
Utility / transmission ownerJCPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.