Ratcliff Solar is a 85.7 MW solar interconnection project in Freestone, Texas with a current status of operational. It is proposed to connect at Tap 138kV 3279 Long Lake Tap Switch - 3280 Long Lake.

85.7 MWCapacity
OperationalStatus
FreestoneMarket
SolarTechnology

Project facts

Canonical nameRatcliff Solar
Queue ID24INR0289
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketFreestone
TechnologySolar
Capacity85.7 MW
StateTexas
CountyFreestone
Point of interconnectionTap 138kV 3279 Long Lake Tap Switch - 3280 Long Lake
Requested (queue) date2022-06-27
Proposed in-service date
Operational date2029-04-07
Withdrawn date
DeveloperGreenalia Solar Power Ratcliff
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata