Rattlesnake W 2 (13INR0020b)

Rattlesnake W 2 is a 158.0 MW wind interconnection project with a current status of withdrawn. It is proposed to connect at 132213 Bearkat 345kV.

158.0 MWCapacity
WithdrawnStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameRattlesnake W 2
Queue ID13INR0020b
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyWind
Capacity158.0 MW
State
County
Point of interconnection132213 Bearkat 345kV
Requested (queue) date2009-12-10
Proposed in-service date2020-05-06
Operational date
Withdrawn date
DeveloperInvenergy
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata