Ravenswood Energy Storage 3 (1242)

Ravenswood Energy Storage 3 is a 70.0 MW battery interconnection project in Queens, New York with a current status of withdrawn. It is proposed to connect at Vernon 138kV.

70.0 MWCapacity
WithdrawnStatus
JMarket
BatteryTechnology

Project facts

Canonical nameRavenswood Energy Storage 3
Queue ID1242
Statuswithdrawn
Source status0
MarketJ
TechnologyBattery
Capacity70.0 MW
StateNew York
CountyQueens
Point of interconnectionVernon 138kV
Requested (queue) date2021-09-03
Proposed in-service date2021-11-30
Operational date
Withdrawn date
DeveloperLight & Power Development, LLC
Utility / transmission ownerCONED

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata