Rawhide 230 (22-07251)
Rawhide 230 is a 250.0 MW gas interconnection project in Wellington, Colorado with a current status of active. It is proposed to connect at Rawhide 230.
250.0 MWCapacity
ActiveStatus
COMarket
GasTechnology
Project facts
| Canonical name | Rawhide 230 |
|---|---|
| Queue ID | 22-07251 |
| Status | active |
| Source status | IA FULLY EXECUTED/ON SCHEDULE |
| Market | CO |
| Technology | Gas |
| Capacity | 250.0 MW |
| State | Colorado |
| County | Wellington |
| Point of interconnection | Rawhide 230 |
| Requested (queue) date | 2022-07-25 |
| Proposed in-service date | 2028-03-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | PRPA |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | active | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata