Rawhide Prairie Solar Hybrid (63722_BA1)

Rawhide Prairie Solar Hybrid is a 1.0 MW battery interconnection project in Larimer, Colorado with a current status of operational.

1.0 MWCapacity
OperationalStatus
PSCOMarket
BatteryTechnology

Project facts

Canonical nameRawhide Prairie Solar Hybrid
Queue ID63722_BA1
Statusoperational
Source status(OP) Operating
MarketPSCO
TechnologyBattery
Capacity1.0 MW
StateColorado
CountyLarimer
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2021-03-01
Withdrawn date
Developer
Utility / transmission ownerGreenbacker Renewable Energy Corporation

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.