RAYBURN ENERGY STATION II Gas (TEF-Due Diligence) (28INR0108)

RAYBURN ENERGY STATION II Gas (TEF-Due Diligence) is a 570.0 MW gas interconnection project in Grayson, Texas with a current status of operational. It is proposed to connect at Double Tap 138 kV Haggerty (12677) - Progress Park (#12678) & Haggerty - Winding Oaks Switch.

570.0 MWCapacity
OperationalStatus
GraysonMarket
GasTechnology

Project facts

Canonical nameRAYBURN ENERGY STATION II Gas (TEF-Due Diligence)
Queue ID28INR0108
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketGrayson
TechnologyGas
Capacity570.0 MW
StateTexas
CountyGrayson
Point of interconnectionDouble Tap 138 kV Haggerty (12677) - Progress Park (#12678) & Haggerty - Winding Oaks Switch
Requested (queue) date2025-01-13
Proposed in-service date
Operational date2028-02-26
Withdrawn date
DeveloperRayburn Country Electric Cooperative, Inc.
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.