RE MUSTANG (643W)

RE MUSTANG is a 100.0 MW solar+battery interconnection project in Kings, California with a current status of operational. It is proposed to connect at Gates-Gregg 230 kV and Gates-McCall 230 kV.

100.0 MWCapacity
OperationalStatus
NoneMarket
Solar+BatteryTechnology

Project facts

Canonical nameRE MUSTANG
Queue ID643W
Statusoperational
Source statusCOMPLETED
MarketNone
TechnologySolar+Battery
Capacity100.0 MW
StateCalifornia
CountyKings
Point of interconnectionGates-Gregg 230 kV and Gates-McCall 230 kV
Requested (queue) date2010-07-31
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata