Realitos Solar SLF (26INR0196)
Realitos Solar SLF is a 150.5 MW solar interconnection project in Duval, Texas with a current status of suspended.
150.5 MWCapacity
SuspendedStatus
DuvalMarket
SolarTechnology
Project facts
| Canonical name | Realitos Solar SLF |
|---|---|
| Queue ID | 26INR0196 |
| Status | suspended |
| Source status | — |
| Market | Duval |
| Technology | Solar |
| Capacity | 150.5 MW |
| State | Texas |
| County | Duval |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-10-30 | developer | Mesquite Creek LLC | — | low |
| 2026-10-30 | poi_name | Bruni (#8297) – Crestonio (#8695) 138 kV line; AEP | — | low |
| 2026-10-30 | phase | SS Completed, FIS Started, No IA | — | low |
| 2026-10-30 | operational_date | 2028-12-15 | — | medium |
| 2026-10-30 | status | operational | suspended | high |
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.