Red Butte Wind (E0027)
Red Butte Wind is a 456.8 MW wind interconnection project in Morton, North Dakota with a current status of active. It is proposed to connect at Nelson Lake 230kV Substation.
456.8 MWCapacity
ActiveStatus
MISOMarket
WindTechnology
Project facts
| Canonical name | Red Butte Wind |
|---|---|
| Queue ID | E0027 |
| Status | active |
| Source status | active |
| Market | MISO |
| Technology | Wind |
| Capacity | 456.8 MW |
| State | North Dakota |
| County | Morton |
| Point of interconnection | Nelson Lake 230kV Substation |
| Requested (queue) date | 2025-08-06 |
| Proposed in-service date | 2028-02-25 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Red Butte Wind, LLC |
| Utility / transmission owner | GREAT RIVER ENERGY |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.