Red Butte Wind is a 456.8 MW wind interconnection project in Morton, North Dakota with a current status of active. It is proposed to connect at Nelson Lake 230kV Substation.

456.8 MWCapacity
ActiveStatus
MISOMarket
WindTechnology

Project facts

Canonical nameRed Butte Wind
Queue IDE0027
Statusactive
Source statusactive
MarketMISO
TechnologyWind
Capacity456.8 MW
StateNorth Dakota
CountyMorton
Point of interconnectionNelson Lake 230kV Substation
Requested (queue) date2025-08-06
Proposed in-service date2028-02-25
Operational date
Withdrawn date
DeveloperRed Butte Wind, LLC
Utility / transmission ownerGREAT RIVER ENERGY

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata