Red Gum 115kV (J1953)

Red Gum 115kV is a 264.6 MW solar interconnection project in Concordia, Louisiana with a current status of withdrawn. It is proposed to connect at Red Gum 115kV.

264.6 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameRed Gum 115kV
Queue IDJ1953
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity264.6 MW
StateLouisiana
CountyConcordia
Point of interconnectionRed Gum 115kV
Requested (queue) date2022-07-20
Proposed in-service date2025-10-01
Operational date2025-10-01
Withdrawn date2023-10-25
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata