Concordia County, Louisiana — Interconnection Projects
The interXdata warehouse tracks 16 interconnection projects in Concordia, Louisiana, representing 1,402 MW of requested capacity.
16Total projects
0Active
9Operational
7Withdrawn
1,402 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 6 | 930 MW |
| Battery | 2 | 280 MW |
| Other | 8 | 192 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Red Gum 115kV | J1953 | Solar | 264.6 MW | withdrawn | Concordia, Louisiana |
| Red Gum | J2228 | Solar | 200.0 MW | operational | Concordia, Louisiana |
| PLANTATION | J2904 | Solar | 150.0 MW | withdrawn | Concordia, Louisiana |
| Persimmon Mill--Red Gum 115kV Line | J2792 | Solar | 150.0 MW | withdrawn | Concordia, Louisiana |
| Red Gum to Metropolis 115 kV | J2479 | Battery | 140.0 MW | withdrawn | Concordia, Louisiana |
| Red Gum to Metropolis 115 kV | J3046 | Battery | 140.0 MW | withdrawn | Concordia, Louisiana |
| VIDALIA | J3272 | Solar | 85.0 MW | withdrawn | Concordia, Louisiana |
| Red Gum 115kV | J2430 | Solar | 80.0 MW | withdrawn | Concordia, Louisiana |
| Sidney A Murray Jr Hydroelectric | 54678_05 | Other | 24.0 MW | operational | Concordia, Louisiana |
| Sidney A Murray Jr Hydroelectric | 54678_07 | Other | 24.0 MW | operational | Concordia, Louisiana |
| Sidney A Murray Jr Hydroelectric | 54678_02 | Other | 24.0 MW | operational | Concordia, Louisiana |
| Sidney A Murray Jr Hydroelectric | 54678_06 | Other | 24.0 MW | operational | Concordia, Louisiana |
| Sidney A Murray Jr Hydroelectric | 54678_08 | Other | 24.0 MW | operational | Concordia, Louisiana |
| Sidney A Murray Jr Hydroelectric | 54678_01 | Other | 24.0 MW | operational | Concordia, Louisiana |
| Sidney A Murray Jr Hydroelectric | 54678_03 | Other | 24.0 MW | operational | Concordia, Louisiana |
| Sidney A Murray Jr Hydroelectric | 54678_04 | Other | 24.0 MW | operational | Concordia, Louisiana |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Concordia County.
Start tracking with interXdata