Red Hollow Renewable Energy Solar SLF (28INR0088)
Red Hollow Renewable Energy Solar SLF is a 308.6 MW solar interconnection project in Archer, Texas with a current status of operational. It is proposed to connect at Tap 345kV (Bus# 1422) Bowman - (Bus# 17002) Garvey Road .
308.6 MWCapacity
OperationalStatus
ArcherMarket
SolarTechnology
Project facts
| Canonical name | Red Hollow Renewable Energy Solar SLF |
|---|---|
| Queue ID | 28INR0088 |
| Status | operational |
| Source status | SS Completed, FIS Started, No IA |
| Market | Archer |
| Technology | Solar |
| Capacity | 308.6 MW |
| State | Texas |
| County | Archer |
| Point of interconnection | Tap 345kV (Bus# 1422) Bowman - (Bus# 17002) Garvey Road |
| Requested (queue) date | 2024-07-01 |
| Proposed in-service date | — |
| Operational date | 2029-04-19 |
| Withdrawn date | — |
| Developer | Red Hollow Renewable Energy LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.