RED MOUNTAIN WIND ENERGY CENTER - C5 (924)

RED MOUNTAIN WIND ENERGY CENTER - C5 is a 150.0 MW wind interconnection project in Merced, California with a current status of withdrawn. It is proposed to connect at Los Banos-Westly 230 kV Line .

150.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameRED MOUNTAIN WIND ENERGY CENTER - C5
Queue ID924
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyWind
Capacity150.0 MW
StateCalifornia
CountyMerced
Point of interconnectionLos Banos-Westly 230 kV Line
Requested (queue) date2012-04-02
Proposed in-service date
Operational date
Withdrawn date2012-08-06
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.