Red Top Solar I (25INR0306)

Red Top Solar I is a 200.6 MW solar interconnection project in Young, Texas with a current status of operational. It is proposed to connect at Tap 138kV 1431 Graham SES - Short Grass 11525.

200.6 MWCapacity
OperationalStatus
YoungMarket
SolarTechnology

Project facts

Canonical nameRed Top Solar I
Queue ID25INR0306
Statusoperational
Source statusSS Completed, FIS Completed, No IA
MarketYoung
TechnologySolar
Capacity200.6 MW
StateTexas
CountyYoung
Point of interconnectionTap 138kV 1431 Graham SES - Short Grass 11525
Requested (queue) date2023-01-17
Proposed in-service date
Operational date2028-11-30
Withdrawn date
DeveloperCat Red Top Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata