Redfish W 2b (14INR0041b)
Redfish W 2b is a 115.0 MW wind interconnection project with a current status of withdrawn. It is proposed to connect at Perm = tap 8383 NEdinb - 8318 RHondo 345kV, ~10.5 mi to RHondo new sub Bonilla +18 mi gen tie. Temp = tap Ajo-RHondo 345kV, ~13.5 mi to RHondo.
Project facts
| Canonical name | Redfish W 2b |
|---|---|
| Queue ID | 14INR0041b |
| Status | withdrawn |
| Source status | withdrawn |
| Market | ERCOT |
| Technology | Wind |
| Capacity | 115.0 MW |
| State | — |
| County | — |
| Point of interconnection | Perm = tap 8383 NEdinb - 8318 RHondo 345kV, ~10.5 mi to RHondo new sub Bonilla +18 mi gen tie. Temp = tap Ajo-RHondo 345kV, ~13.5 mi to RHondo |
| Requested (queue) date | 2013-01-02 |
| Proposed in-service date | 2016-12-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Eon |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata