RedSun BESS (27INR0125)

RedSun BESS is a 84.0 MW other interconnection project in Burnet, Texas with a current status of operational. It is proposed to connect at Existing Line from Substation Name: Burnet (PSSE#7100) to Substation Name: Bertram (PSSE#7520).

84.0 MWCapacity
OperationalStatus
BurnetMarket
OtherTechnology

Project facts

Canonical nameRedSun BESS
Queue ID27INR0125
Statusoperational
Source statusSS Completed, FIS Completed, No IA
MarketBurnet
TechnologyOther
Capacity84.0 MW
StateTexas
CountyBurnet
Point of interconnectionExisting Line from Substation Name: Burnet (PSSE#7100) to Substation Name: Bertram (PSSE#7520)
Requested (queue) date2023-12-04
Proposed in-service date
Operational date2028-08-28
Withdrawn date
DeveloperGransolar Texas Twenty Two
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata