RedSun Solar (27INR0124)
RedSun Solar is a 82.5 MW solar interconnection project in Burnet, Texas with a current status of operational. It is proposed to connect at Tap 138kV 7100 Burnet - 7529 Bertram.
82.5 MWCapacity
OperationalStatus
BurnetMarket
SolarTechnology
Project facts
| Canonical name | RedSun Solar |
|---|---|
| Queue ID | 27INR0124 |
| Status | operational |
| Source status | SS Completed, FIS Completed, IA |
| Market | Burnet |
| Technology | Solar |
| Capacity | 82.5 MW |
| State | Texas |
| County | Burnet |
| Point of interconnection | Tap 138kV 7100 Burnet - 7529 Bertram |
| Requested (queue) date | 2023-12-04 |
| Proposed in-service date | — |
| Operational date | 2028-08-28 |
| Withdrawn date | — |
| Developer | Redsun Solar Project LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-09-30 | developer | — | Redsun Solar Project LLC | low |
| 2026-09-30 | poi_name | — | Tap 138kV 7100 Burnet - 7529 Bertram | low |
| 2026-09-30 | phase | — | SS Completed, FIS Completed, IA | low |
| 2026-09-30 | ia_signed_date | — | 2025-09-25 | medium |
| 2026-09-30 | operational_date | — | 2028-08-28 | medium |
| 2026-09-30 | status | suspended | operational | high |
| 2026-08-31 | developer | Gransolar Texas Twenty Two | — | low |
| 2026-08-31 | poi_name | Tap 138kV 7100 Burnet - 7529 Bertram | — | low |
| 2026-08-31 | phase | SS Completed, FIS Completed, IA | — | low |
| 2026-08-31 | ia_signed_date | 2025-09-25 | — | medium |
| 2026-08-31 | operational_date | 2028-08-28 | — | medium |
| 2026-08-31 | status | operational | suspended | high |
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-12
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.