Redtail 115 Substation (GI-CS-2025-05)

Redtail 115 Substation is a 300.0 MW solar interconnection project in Weld County,, Colorado with a current status of operational. It is proposed to connect at Redtail 115 Substation.

300.0 MWCapacity
OperationalStatus
COMarket
SolarTechnology

Project facts

Canonical nameRedtail 115 Substation
Queue IDGI-CS-2025-05
Statusoperational
Source statusDISIS STAGE
MarketCO
TechnologySolar
Capacity300.0 MW
StateColorado
CountyWeld County,
Point of interconnectionRedtail 115 Substation
Requested (queue) date2025-09-18
Proposed in-service date
Operational date2029-12-01
Withdrawn date
Developer
Utility / transmission ownerTSGT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; tristate-oasis. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata