Redtail 115 Substation (TI-18-0827)

Redtail 115 Substation is a 145.0 MW wind interconnection project in Weld County, Colorado with a current status of active. It is proposed to connect at Redtail 115 Substation.

145.0 MWCapacity
ActiveStatus
COMarket
WindTechnology

Project facts

Canonical nameRedtail 115 Substation
Queue IDTI-18-0827
Statusactive
Source statusIA FULLY EXECUTED/ON SCHEDULE
MarketCO
TechnologyWind
Capacity145.0 MW
StateColorado
CountyWeld County
Point of interconnectionRedtail 115 Substation
Requested (queue) date2018-08-27
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerTSGT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata