Renegade Project (20INR0255)

Renegade Project is a 515.7 MW solar interconnection project in Deaf Smith, Texas with a current status of operational. It is proposed to connect at Tap 345kV 23910 Windmill - 23906 AJ Swope.

515.7 MWCapacity
OperationalStatus
Deaf SmithMarket
SolarTechnology

Project facts

Canonical nameRenegade Project
Queue ID20INR0255
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketDeaf Smith
TechnologySolar
Capacity515.7 MW
StateTexas
CountyDeaf Smith
Point of interconnectionTap 345kV 23910 Windmill - 23906 AJ Swope
Requested (queue) date2019-02-26
Proposed in-service date
Operational date2027-12-16
Withdrawn date
DeveloperRenegade Renewable LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.