Renegade Solar Project (Dawn) (65310_DAWN1)

Renegade Solar Project (Dawn) is a 515.0 MW solar interconnection project in Deaf Smith, Texas with a current status of active.

515.0 MWCapacity
ActiveStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameRenegade Solar Project (Dawn)
Queue ID65310_DAWN1
Statusactive
Source status(T) Regulatory approvals received. Not under construction
MarketERCO
TechnologySolar
Capacity515.0 MW
StateTexas
CountyDeaf Smith
Point of interconnection—
Requested (queue) date—
Proposed in-service date2027-12-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerRenegade Renewable LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata