Reno-Summit 345kV Line (GEN-2017-204)

Reno-Summit 345kV Line is a 210.0 MW solar interconnection project in McPherson, Kansas with a current status of withdrawn. It is proposed to connect at Reno-Summit 345kV Line.

210.0 MWCapacity
WithdrawnStatus
KSMarket
SolarTechnology

Project facts

Canonical nameReno-Summit 345kV Line
Queue IDGEN-2017-204
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologySolar
Capacity210.0 MW
StateKansas
CountyMcPherson
Point of interconnectionReno-Summit 345kV Line
Requested (queue) date2017-11-30
Proposed in-service date—
Operational date—
Withdrawn date2022-03-14
Developer—
Utility / transmission ownerWERE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata