McPherson County, Kansas — Interconnection Projects
The interXdata warehouse tracks 16 interconnection projects in McPherson, Kansas, representing 2,923 MW of requested capacity.
16Total projects
2Active
6Operational
8Withdrawn
2,923 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 5 | 961 MW |
| Wind | 3 | 912 MW |
| Gas | 6 | 679 MW |
| Battery | 1 | 300 MW |
| Other | 1 | 71 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Reno - Summit 345kV | GEN-2016-114 | Wind | 310.0 MW | withdrawn | McPherson, Kansas |
| Reno - Summit 345kV | GEN-2016-111 | Wind | 302.0 MW | active | McPherson, Kansas |
| Neosho 345kV Substation | GEN-2017-211 | Solar | 300.0 MW | withdrawn | McPherson, Kansas |
| Reno - Summit 345kV | GEN-2026-SR16 | Battery | 300.0 MW | active | McPherson, Kansas |
| Reno - Summit 345 kV Line | GEN-2024-142 | Wind | 300.0 MW | withdrawn | McPherson, Kansas |
| LaCygne - Neosho 345kV | GEN-2017-209 | Solar | 300.0 MW | withdrawn | McPherson, Kansas |
| Reno-Summit 345kV Line | GEN-2017-204 | Solar | 210.0 MW | withdrawn | McPherson, Kansas |
| Tap Reno - Summit 345kV | GEN-2014-011 | Gas | 172.0 MW | withdrawn | McPherson, Kansas |
| Benton 138kV Substation | GEN-2017-208 | Solar | 150.0 MW | withdrawn | McPherson, Kansas |
| Johns-Manville 115 kV Substation | GEN-2024-047 | Gas | 123.7 MW | withdrawn | McPherson, Kansas |
| Johns-Manville 115 kV Substation | ASGI-2024-020 | Gas | 123.7 MW | operational | McPherson, Kansas |
| McPherson 3 | 7515_NA1 | Gas | 115.6 MW | operational | McPherson, Kansas |
| McPherson 2 | 1305_GT1 | Gas | 72.4 MW | operational | McPherson, Kansas |
| McPherson 2 | 1305_GT2 | Other | 71.2 MW | operational | McPherson, Kansas |
| McPherson 2 | 1305_GT3 | Gas | 71.2 MW | operational | McPherson, Kansas |
| Lindsborg | 68697_LINDB | Solar | 1.0 MW | operational | McPherson, Kansas |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in McPherson County.