Renovo Energy Center (0496)

Renovo Energy Center is a 480.0 MW gas interconnection project in Clinton, Pennsylvania with a current status of withdrawn. It is proposed to connect at Homer City - Mainsburg 345kV.

480.0 MWCapacity
WithdrawnStatus
CMarket
GasTechnology

Project facts

Canonical nameRenovo Energy Center
Queue ID0496
Statuswithdrawn
Source status0
MarketC
TechnologyGas
Capacity480.0 MW
StatePennsylvania
CountyClinton
Point of interconnectionHomer City - Mainsburg 345kV
Requested (queue) date2015-04-13
Proposed in-service date2021-02-28
Operational date
Withdrawn date
DeveloperRenovo Energy Center, LLC
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.