Repowering Increase (642)

Repowering Increase is a 34.9 MW gas interconnection project in Norfolk, Massachusetts with a current status of withdrawn. It is proposed to connect at BELD station 16 switchyard.

34.9 MWCapacity
WithdrawnStatus
SEMAMarket
GasTechnology

Project facts

Canonical nameRepowering Increase
Queue ID642
Statuswithdrawn
Source statusW
MarketSEMA
TechnologyGas
Capacity34.9 MW
StateMassachusetts
CountyNorfolk
Point of interconnectionBELD station 16 switchyard
Requested (queue) date2017-04-26
Proposed in-service date2021-05-22
Operational date
Withdrawn date2017-05-31
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata