REVOLUTION BESS (27INR0254)
REVOLUTION BESS is a 208.8 MW battery interconnection project in La Salle, Texas with a current status of withdrawn.
208.8 MWCapacity
WithdrawnStatus
La SalleMarket
BatteryTechnology
Project facts
| Canonical name | REVOLUTION BESS |
|---|---|
| Queue ID | 27INR0254 |
| Status | withdrawn |
| Source status | — |
| Market | La Salle |
| Technology | Battery |
| Capacity | 208.8 MW |
| State | Texas |
| County | La Salle |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | 2026-06-15 |
| Developer | — |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata