Reynolds 345 kV (AE1-211)

Reynolds 345 kV is a 302.4 MW wind interconnection project in Jasper, Indiana with a current status of withdrawn.

302.4 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameReynolds 345 kV
Queue IDAE1-211
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity302.4 MW
StateIndiana
CountyJasper
Point of interconnection
Requested (queue) date2018-09-27
Proposed in-service date2020-10-31
Operational date
Withdrawn date2018-10-01
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.