Rice - Beaver Creek 161kV line tap (J898)

Rice - Beaver Creek 161kV line tap is a 100.0 MW wind interconnection project in Howard County, Iowa with a current status of operational. It is proposed to connect at Rice - Beaver Creek 161kV line tap.

100.0 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical nameRice - Beaver Creek 161kV line tap
Queue IDJ898
Statusoperational
Source statusDone
Market
TechnologyWind
Capacity100.0 MW
StateIowa
CountyHoward County
Point of interconnectionRice - Beaver Creek 161kV line tap
Requested (queue) date2017-06-16
Proposed in-service date2021-10-01
Operational date2021-10-01
Withdrawn date
Developer
Utility / transmission ownerDAIRYLAND POWER COOPERATIVE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata