Rich Road Storage (1355)

Rich Road Storage is a 20.0 MW battery interconnection project in St. Lawrence, New York with a current status of withdrawn. It is proposed to connect at Moses - Adirondack 230 kV.

20.0 MWCapacity
WithdrawnStatus
EMarket
BatteryTechnology

Project facts

Canonical nameRich Road Storage
Queue ID1355
Statuswithdrawn
Source status0
MarketE
TechnologyBattery
Capacity20.0 MW
StateNew York
CountySt. Lawrence
Point of interconnectionMoses - Adirondack 230 kV
Requested (queue) date2022-03-23
Proposed in-service date2022-12-31
Operational date
Withdrawn date
DeveloperEDF Renewables Development, Inc.
Utility / transmission ownerNYPA

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata