Richard B Russell (6132_8)
Richard B Russell is a 82.0 MW battery interconnection project in Elbert, Georgia with a current status of operational.
82.0 MWCapacity
OperationalStatus
SEPAMarket
BatteryTechnology
Project facts
| Canonical name | Richard B Russell |
|---|---|
| Queue ID | 6132_8 |
| Status | operational |
| Source status | (OA) Out of service but expected to return to service in next calendar year |
| Market | SEPA |
| Technology | Battery |
| Capacity | 82.0 MW |
| State | Georgia |
| County | Elbert |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | 2002-09-01 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | USCE-Savannah District |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata