Richland III Solar (C24-349-005)

Richland III Solar is a 79.9 MW solar interconnection project in Oswego, New York with a current status of withdrawn. It is proposed to connect at Indeck Oswego - Tar Hill Line 2 115kV.

79.9 MWCapacity
WithdrawnStatus
NYISOMarket
SolarTechnology

Project facts

Canonical nameRichland III Solar
Queue IDC24-349-005
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologySolar
Capacity79.9 MW
StateNew York
CountyOswego
Point of interconnectionIndeck Oswego - Tar Hill Line 2 115kV
Requested (queue) date2024-10-14
Proposed in-service date
Operational date
Withdrawn date
DeveloperRIC Development, LLC
Utility / transmission ownerNM-NG

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata