Ridgeway - Motion Control 46 kV is a 20.0 MW solar interconnection project in Elk, Pennsylvania with a current status of withdrawn.

20.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameRidgeway - Motion Control 46 kV
Queue IDAG2-538 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity20.0 MW
StatePennsylvania
CountyElk
Point of interconnection—
Requested (queue) date2021-03-31
Proposed in-service date2022-10-15
Operational date—
Withdrawn date2025-02-28
Developer—
Utility / transmission ownerAPS

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata