RITCHIE SWYD - TARLETON 230.0kV (J3540)

RITCHIE SWYD - TARLETON 230.0kV is a 400.0 MW solar interconnection project in Monroe, Arkansas with a current status of withdrawn. It is proposed to connect at RITCHIE SWYD - TARLETON 230.0kV.

400.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameRITCHIE SWYD - TARLETON 230.0kV
Queue IDJ3540
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity400.0 MW
StateArkansas
CountyMonroe
Point of interconnectionRITCHIE SWYD - TARLETON 230.0kV
Requested (queue) date2024-04-15
Proposed in-service date2028-05-13
Operational date2028-05-13
Withdrawn date2025-07-31
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.