Riverbank Power D1 (0279)

Riverbank Power D1 is a 1,000.0 MW battery interconnection project in St. Lawrence, New York with a current status of withdrawn. It is proposed to connect at Massena 765kV.

1,000.0 MWCapacity
WithdrawnStatus
EMarket
BatteryTechnology

Project facts

Canonical nameRiverbank Power D1
Queue ID0279
Statuswithdrawn
Source status0
MarketE
TechnologyBattery
Capacity1,000.0 MW
StateNew York
CountySt. Lawrence
Point of interconnectionMassena 765kV
Requested (queue) date2008-02-20
Proposed in-service date2010-03-31
Operational date
Withdrawn date
DeveloperRiverbank Power Corporation
Utility / transmission ownerNYPA

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.