Riverhead Energy, LLC is a 100.0 MW battery interconnection project in Suffolk, New York with a current status of withdrawn. It is proposed to connect at Riverhead - Jamesport 69kV.

100.0 MWCapacity
WithdrawnStatus
KMarket
BatteryTechnology

Project facts

Canonical nameRiverhead Energy, LLC
Queue ID1307
Statuswithdrawn
Source status0
MarketK
TechnologyBattery
Capacity100.0 MW
StateNew York
CountySuffolk
Point of interconnectionRiverhead - Jamesport 69kV
Requested (queue) date2021-11-16
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperRiverhead Energy
Utility / transmission ownerLIPA

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.