Riverhead (0603)
Riverhead is a 7.5 MW solar interconnection project in Suffolk, New York with a current status of withdrawn. It is proposed to connect at Wildwood - Riverhead 69kV.
7.5 MWCapacity
WithdrawnStatus
KMarket
SolarTechnology
Project facts
| Canonical name | Riverhead |
|---|---|
| Queue ID | 0603 |
| Status | withdrawn |
| Source status | 0 |
| Market | K |
| Technology | Solar |
| Capacity | 7.5 MW |
| State | New York |
| County | Suffolk |
| Point of interconnection | Wildwood - Riverhead 69kV |
| Requested (queue) date | 2017-02-03 |
| Proposed in-service date | 2018-05-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Hecate Energy |
| Utility / transmission owner | LIPA |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata