Riverside 115kV Substation (J3213)

Riverside 115kV Substation is a 55.0 MW gas interconnection project in Hennepin, Minnesota with a current status of operational. It is proposed to connect at Riverside 115kV Substation.

55.0 MWCapacity
OperationalStatus
Market
GasTechnology

Project facts

Canonical nameRiverside 115kV Substation
Queue IDJ3213
Statusoperational
Source statusActive
Market
TechnologyGas
Capacity55.0 MW
StateMinnesota
CountyHennepin
Point of interconnectionRiverside 115kV Substation
Requested (queue) date2022-09-01
Proposed in-service date2026-12-31
Operational date2026-12-31
Withdrawn date
Developer
Utility / transmission ownerNORTHERN STATES POWER COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata