Riviera Gas (29INR0206)

Riviera Gas is a 636.9 MW gas interconnection project in Bell, Texas with a current status of operational. It is proposed to connect at Tap #3414 Temple Switch - #3780 Tower Switch 345kV DCKT Line.

636.9 MWCapacity
OperationalStatus
BellMarket
GasTechnology

Project facts

Canonical nameRiviera Gas
Queue ID29INR0206
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketBell
TechnologyGas
Capacity636.9 MW
StateTexas
CountyBell
Point of interconnectionTap #3414 Temple Switch - #3780 Tower Switch 345kV DCKT Line
Requested (queue) date2025-11-05
Proposed in-service date
Operational date2030-06-14
Withdrawn date
DeveloperBKV-BPP Power
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata