Roadrunner Crossing Wind (Uprate) (26INR0726)

Roadrunner Crossing Wind (Uprate) is a 7.3 MW other interconnection project in Eastland, Texas with a current status of operational. It is proposed to connect at 68051 Reata 345kV.

7.3 MWCapacity
OperationalStatus
EastlandMarket
OtherTechnology

Project facts

Canonical nameRoadrunner Crossing Wind (Uprate)
Queue ID26INR0726
Statusoperational
Source statusSS Completed, FIS Completed, No IA
MarketEastland
TechnologyOther
Capacity7.3 MW
StateTexas
CountyEastland
Point of interconnection68051 Reata 345kV
Requested (queue) date2025-12-23
Proposed in-service date—
Operational date2027-06-30
Withdrawn date—
DeveloperRoadrunner Crossing Wind Farm, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-30capacity_mw2.77.32high
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata