Roadrunner Wind Farm (66902_5317)

Roadrunner Wind Farm is a 256.0 MW wind interconnection project in Eastland, Texas with a current status of operational.

256.0 MWCapacity
OperationalStatus
ERCOMarket
WindTechnology

Project facts

Canonical nameRoadrunner Wind Farm
Queue ID66902_5317
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyWind
Capacity256.0 MW
StateTexas
CountyEastland
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2024-07-01
Withdrawn date
Developer
Utility / transmission ownerRoadrunner Crossing Wind Farm, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata