Robert E Ritchie - Stuttgart Rcuskey 230kV (J2006)

Robert E Ritchie - Stuttgart Rcuskey 230kV is a 40.0 MW battery interconnection project in Arkansas, Arkansas with a current status of withdrawn. It is proposed to connect at Robert E Ritchie - Stuttgart Rcuskey 230kV.

40.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameRobert E Ritchie - Stuttgart Rcuskey 230kV
Queue IDJ2006
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity40.0 MW
StateArkansas
CountyArkansas
Point of interconnectionRobert E Ritchie - Stuttgart Rcuskey 230kV
Requested (queue) date2021-08-26
Proposed in-service date2025-10-01
Operational date2025-10-01
Withdrawn date2023-10-25
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata