Rock House Draw Gas (27INR0653)

Rock House Draw Gas is a 523.0 MW gas interconnection project in Pecos, Texas with a current status of operational. It is proposed to connect at 38431 TNCENTRY1_1 138 KV.

523.0 MWCapacity
OperationalStatus
PecosMarket
GasTechnology

Project facts

Canonical nameRock House Draw Gas
Queue ID27INR0653
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketPecos
TechnologyGas
Capacity523.0 MW
StateTexas
CountyPecos
Point of interconnection38431 TNCENTRY1_1 138 KV
Requested (queue) date2026-06-25
Proposed in-service date—
Operational date2027-11-29
Withdrawn date—
DeveloperLongfellow Power LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-30phaseSS Started, FIS Started, No IASS Completed, FIS Started, No IAlow
2026-10-30operational_date—2027-11-29medium
2026-10-30proposed_online_date2027-11-29—medium
2026-10-30statusactiveoperationalhigh
2026-08-31proposed_online_date2027-10-292027-11-29medium
2026-07-31new_project—activehigh

Explore related data

Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata