Rock Island Generating (TEF -Due Diligence) (27INR0321)

Rock Island Generating (TEF -Due Diligence) is a 121.8 MW gas interconnection project in Colorado, Texas with a current status of operational. It is proposed to connect at 57640 Rock Island 138 kV.

121.8 MWCapacity
OperationalStatus
ColoradoMarket
GasTechnology

Project facts

Canonical nameRock Island Generating (TEF -Due Diligence)
Queue ID27INR0321
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketColorado
TechnologyGas
Capacity121.8 MW
StateTexas
CountyColorado
Point of interconnection57640 Rock Island 138 kV
Requested (queue) date2024-07-22
Proposed in-service date
Operational date2027-06-01
Withdrawn date
DeveloperKerrville Public Utility Board Public Facility Corp
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata