Rose Capital Solar (28INR0284)

Rose Capital Solar is a 205.0 MW solar interconnection project with a current status of withdrawn. It is proposed to connect at The point of interconnection is the 345-kV Martin Lake (PSSE #3100) to Shamburger Switch (PSSE#3103) transmission line..

205.0 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameRose Capital Solar
Queue ID28INR0284
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity205.0 MW
State
County
Point of interconnectionThe point of interconnection is the 345-kV Martin Lake (PSSE #3100) to Shamburger Switch (PSSE#3103) transmission line.
Requested (queue) date
Proposed in-service date2028-05-15
Operational date
Withdrawn date
DeveloperACE DEVCO NC, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.