Rosemount - Nininger 115kV Line (J863)
Rosemount - Nininger 115kV Line is a 220.0 MW gas interconnection project in Dakota County, Minnesota with a current status of withdrawn. It is proposed to connect at Rosemount - Nininger 115kV Line.
220.0 MWCapacity
WithdrawnStatus
—Market
GasTechnology
Project facts
| Canonical name | Rosemount - Nininger 115kV Line |
|---|---|
| Queue ID | J863 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Gas |
| Capacity | 220.0 MW |
| State | Minnesota |
| County | Dakota County |
| Point of interconnection | Rosemount - Nininger 115kV Line |
| Requested (queue) date | 2017-06-16 |
| Proposed in-service date | 2021-01-01 |
| Operational date | 2021-01-01 |
| Withdrawn date | 2018-12-18 |
| Developer | — |
| Utility / transmission owner | NORTHERN STATES POWER COMPANY |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata